Australia’s industrial heat demonstrations are advancing. For manufacturers, the first project decision is how much heat can be avoided or recovered before sizing new equipment around the remaining production duty.
A demonstration is opening a wider operating question
ARENA’s October announcement of support for industrial heat electrification at Rio Tinto’s Yarwun alumina refinery brings the issue into a demanding production environment. The agency describes a thermal energy storage demonstration intended to supply steam, with initial support for engineering and design and deployment funding dependent on successful completion of that work. It is a project to test performance and integration, not evidence that every factory can already replace its existing heat system on equivalent terms. [1]
For manufacturers assessing their own equipment, the practical question starts one step earlier: how much purchased heat is genuinely needed to make the product? Oakhampton’s analysis is that replacing an existing boiler’s full duty without first examining avoidable demand can lock yesterday’s process losses into tomorrow’s equipment specification. The useful starting point is the production task, not the fuel or the nameplate rating.
Separate productive heat from avoidable losses
The Australian Government’s waste heat recovery guidance recommends reducing unnecessary heat generation and losses before major investment in recovery equipment. It identifies metering, insulation, equipment tuning and maintenance among the practical measures. It also calls for assessment of temperature, flow and contaminants when evaluating potential heat sources. These are operating characteristics, rather than a single annual energy total. [2]
Our proposed first step is a heat-use register for each production line. Record what is heated, the required temperature, when that temperature must be reached and how long it must be maintained. Separate normal production from cleaning, start-up and standby. Then compare those duties with measured fuel use. The gap is a question for investigation, not automatically an available saving: some losses may be unavoidable or expensive to address.
This exercise also establishes a fair comparison. If insulation and revised controls reduce demand before new equipment is installed, those gains belong in the improved baseline. Counting them again as benefits of a replacement system would overstate its contribution. A credible project case keeps demand reduction and equipment performance visible as separate decisions.
Match recovered heat to a real use
The same government guide identifies pre-heating as a common use for recovered heat and describes opportunities in refrigeration, compressors and boiler systems. It notes that specialist heat pumps can raise the temperature of waste heat, while emphasising the importance of design and implementation. Recovery is therefore a matching exercise: a heat source must suit an actual process requirement. [2]
Consider an illustrative factory that rejects heat during an afternoon production run but needs hot water mainly for morning cleaning. An annual energy balance might suggest a strong match; the operating schedule reveals a timing problem. The options could include storage, a different operating sequence or a smaller recovery installation. Each needs engineering assessment. The point is not that recovery fails, but that useful recovered energy must be measured at the time and place it can be consumed.
Procurement should consequently ask for performance over the operating range, including part-load production and cleaning periods. A proposal based on one favourable design point is not enough to compare different systems. The production team should help define those conditions before suppliers prepare their final equipment offers.
Choose the technology after defining the duty
The US Department of Energy’s process heating guidance takes a portfolio approach. It includes direct electrification, alternative thermal sources, waste heat management and processes that need less heat to achieve the same product. Its underlying message is that applications differ: the appropriate solution depends on the process and its operating context. [3]
For a project team, that means comparing realistic configurations against the reduced heat requirement. One line may need a different solution from another. Include installation disruption, maintenance access, spare capacity and the arrangements for keeping production running while work proceeds. These are proposed project-selection criteria, not claims about the performance of any particular vendor or the Yarwun demonstration.
Make acceptance a production test
Our recommended acceptance test measures useful heat delivered alongside product throughput and quality. Agree the measurement boundary, representative operating conditions and responsibility for investigating shortfalls before placing the order. Keep a clear distinction between equipment commissioning and sustained operation through an ordinary production cycle.
The commercial objective is a better manufacturing system, not simply a different energy source. A heat upgrade is easier to evaluate when avoidable demand has been addressed, recovery has a defined use and the remaining duty is explicit. That sequence gives equipment suppliers a clearer brief and gives the manufacturer a result it can verify.
Sources
- Demonstrating a new pathway for electrifying industrial heat at scaleAustralian Renewable Energy Agency · 21 October 2026
- Waste heat recoveryAustralian Government — energy.gov.au
- Finding Efficiencies in Process HeatUS Department of Energy